Archive for the ‘biloxi’ Category

we’re famous on the gulf coast!

Sunday, July 5th, 2009

check out the article in the sun herald written about our mosaic:

http://www.sunherald.com/living/story/1452906.html

pretty exciting!

617-mosaic-images-009.jpgfor all interested parties, fran is teaching a mosaic class at the terra linda rec 617-mosaic-images-008.jpgcenter starting this monday evening, july 6th, from 6-9pm. the class goes for 4 consecutive mondays and supplies will be provided. if you have something special you would like to mosaic bring it along, otherwise backerboard squares will be available.

6.27.09 last day at shirley’s

Monday, June 29th, 2009

rose-and-fran-grouting.JPGned-and-chopsaw.JPGerics-threshold.JPGjane-painting.JPGmutti-painting.JPGpink-wall.JPGkitchen-floor-done-2.JPGkitchen-floor-done.JPG

the floor was completed. the trim is done and painted. two accent walls in each bathroom are painted and all the thresholds between tiles and wood floor are done!

6.26.09 usurped by the michiganders

Friday, June 26th, 2009

kitchen-floor.JPGrose-grouting.JPGabbey-grouting.JPGshirley-and-the-macmurtrey-girls.JPGblue-into-pink.JPG

eric’s cousins and mom arrived and joined the tile babes and sanded, caulked and spackled windows.

the green tiles for the kitchen floor finally came and were installed by beth and emilio.

we have two tile dudes: colton and avi.

the bathroom floors are all grouted.

christian michiganders came at about 2:00 to install finish flooring and we were pushed off the job! now we will have to paint over finished floor….go figure……this process works in mysterious ways!

so we took the afternoon off, luckily we had an early start and lots of helpers so still much was accomplished.

eric golfed, rose relaxed and the rest of us swam in the gulf.

you know it’s hot when the gulf water is hotter than your shower water.

we are going to the shed for blues and bbq tonight.

we are all saddened by the loss of michael jackson, farrah fawcett and teo the dog (ruben, emilio and avi’s dog).

6.24.09 one floor complete!

Wednesday, June 24th, 2009

tile thresholdp1010115.JPGp1010103.JPG

tile threshold         finished floor   jambed window     

today in her final effort before she left laura grouted the beautiful  biloxi blue bath floor. but she was not alone in the effort. the tile babes rallied in support of her. barb’s final effort was fully engaged with rose in finishing the pink floor layout and cementing tiles. those two tile babes will be sorely missed. we are hoping to recruit new babes later in the week.

the pink floor continues in it’s quest to equal the magnificence of the blue floor. it’s about 2 days away, more work to be done, fewer babes to do it. our techniques though have improved.

the boys were jambing on and on. they may never finish. (not!)

soon we will be caulking, sanding and painting the newly applied jambs and trim.

clearly it was way to hot for most people to work so instead many visitors came by to check our handiwork: david perkes (head architect of gccds),vince(fellow architect), seth (shirley’s architect), stan the materials man with much insight about life after the storm and jeremy of hope force.

record high temperatures continue to engulf the gulf………today not a breeze was to be felt.

p1010100.JPGp1010102.JPGp1010105.JPGt

     grouting          w/ architect        tile babes

6.23.09 death of a phone

Tuesday, June 23rd, 2009

p1010099.JPGp1010095.JPGp1010093.JPGp1010091.JPGp1010094.JPGp1010089.JPGp1010083.JPGp1010079.JPGp1010077.JPGp1010076.JPG

last night fran industriously did the laundry.  fortunately eric’s shorts emerged from the wash, fresh and clean, unfortunately his phone emerged from the wash dead and limpid, ready for the trash (which is picked up on tuesdays and fridays).

fortunately eric was able to work all day. unfortunately fran and eric had to leave a bit early to go to the verizon store.

fortunately there was a $100 of credit for equipment, unfortunately it didn’t cover the new pink blackberrry fran purchased.

meanwhile………………………

a tremendously terrific transitional threshold was tiled by three of the titillating tile tarts……

we have two new tile babes in our midst, three new tile cutters, one new jamber, one new backer board installer and two new runners.  much was accomplished!

the kids and ruben salted themselves in the gulf which ruben discovered is not fresh water.

beth slept for 5 hours.

emilio won at uno twice.

a sumptuous meal was prepared which included fresh local produce and all is good at the historic harrison house.

tomorrow is another day.