the floor was completed. the trim is done and painted. two accent walls in each bathroom are painted and all the thresholds between tiles and wood floor are done!
This entry was posted
on Monday, June 29th, 2009 at 9:55 pm and is filed under biloxi, building, mosaic.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.
May 4th, 2010 at 6:23 pm
в топку…
Администратор
the floor was completed. the trim is done and painted…..
May 12th, 2010 at 8:16 am
Я могу проконсультировать Вас по этому вопросу и специально зарегистрировался, чтобы поучаствовать в обсуждении….
Контролер охраны
the floor was completed. the trim is done and painted…..